Resources

Field Resources

Pipe Running Procedures:

DUO Pipe Running Procedure

Pipe Running Procedure

Field Inspection Procedures:

DUO Field Inspection Procedure

CTP Field Inspection Procedure

Field Inspection Drawings: 

Connection Blanking Drawings: 

Performance Data Sheets

400 DUO 4.500″ S135 16.6# (5.250″ x 2.688″): Imperial, Metric

 400 DUO 4.500″ S135 20.0# (5.250″ x 2.688″): Imperial, Metric

DS 40 4.500″ S135 16.6# (5.250″ x 2.688″): Imperial, Metric

DS 40 4.500″ S135 20.0# (5.250″ x 2.688″): Imperial, Metric

For drill pipe, heavy-weight drill pipe (HWDP), or collar data sheets not listed above, please contact us.

Technical Bulletins

Explore Our Work

Learn more about some of the projects and accomplishments we’re proud to share.

Join Our Team

Learn more about the values we share here at Complete Group and view current opportunities.

Top