DUO Continues to Provide Low Cost of Ownership – Update

Recently an inspection was performed on a string of custom built 4 3/4″ drill pipe with 480 DUO connections. The results of the inspection are highlighted in this revised summary report. The report has been updated to show how Complete Group’s expertise reduced the amount of machine shop repairs. The video above shows the work […]
DUO Inspection Results Summary
DUO inspection results across all sizes in use continue to be positive and provide lower repair costs to its users. A summary can be found in the link below. DUO Inspection Results Summary DUO Brochure DUO Highlights […]